Floor-by-floor horizontal cabling, fiber risers and IDF build-outs for offices and headquarters.
Talk to us about your corporate projectCat6A and fiber, pre-wire for new construction, rack build-outs and security and AV cabling, certified and documented. Installed by DIST field crews nationwide.




Drawings if you have them, the number of drops or rooms, whether the space is under construction or occupied, and your timeline are enough to start. We come back with a count and a quote.

“We solve AV and IT challenges with passion, speed & integrity. Happy to sit on a call to discuss your AV and IT needs.”
Pathways, cable, racks and termination designed together, so every system that rides on the cabling works on day one and ten years from now.

Horizontal and backbone cabling designed to TIA standards, certified with test reports for every drop, so the network you pay for is the network you get.

Racks, patch panels, cable management and power assembled, dressed and labeled so any technician can trace a port in seconds, years from now.

Cabling for cameras, door readers, locks, intercoms and alarm panels, run and terminated so the security integrator, often us, can commission on day one.

Pathways, conduit, boxes and cable pulled while walls and ceilings are open, coordinated with your GC, architect and owner's rep so nothing is cut open later.

Cat6A and fiber upgrades in occupied buildings, re-termination and certification of existing runs, and rack cleanups that end cable chaos, with cutovers after hours.

Speaker wire, HDMI and HDBaseT, display drops, access point runs and control wiring for lighting and shades, planned alongside the AV design.
We work through these four points with you during design, before the first cable is pulled.
TIA-568 design, manufacturer-certified components and a printed test report for every link at handover.
Plenum ratings, firestopping, conduit fill and separation from power handled correctly the first time, so inspections pass.
Every cable, port and panel labeled to one scheme, with as-built drawings so future moves and adds take minutes.
Rough-in, trim and testing sequenced with the construction schedule, and after-hours work in occupied buildings.

As official IT provider, DIST pulled, terminated and certified the structured cabling behind the venue's network, cameras and access control, on a schedule that could not move.
Plan a cabling projectCabling designed for how each building is used and what will run on it.

Floor-by-floor horizontal cabling, fiber risers and IDF build-outs for offices and headquarters.
Talk to us about your corporate projectTwenty drops or two thousand, the sequence is the same, and every link is certified before handover.

We review architectural and MEP drawings, walk the site and count every drop, pathway and rack location with your team.
Cable schedule, pathway plan, rack elevations and labeling scheme, submitted for approval with a fixed, itemized quote.
Pathways, conduit, boxes and cable pulled while the building is open, sequenced with the GC schedule.
Faceplates, patch panels and racks terminated and dressed after finishes are in, with every cable labeled.
Every copper link and fiber strand tested to spec, with a certification report delivered at handover.
Drawings, port maps and photos handed over, then our field team handles moves, adds and changes as the space evolves.
DIST field crews handle the moves, adds and changes that follow every fit-out, and our help desk answers 24/7 when a link goes down.

Have drawings for a new build or a rack that needs rescuing? Send them over and we will count the drops and quote it.
“That massive 59-foot LED wall [DIST] put in has transformed how we run town halls and seminars.”
Ready for infrastructure built to last?
Certified components from the brands structured cabling is built on.
Cost, cable categories, construction coordination and certification, answered.
It is usually priced per drop and depends on cable category, run length, pathway difficulty and whether the building is open or occupied. Fiber backbones, racks and conduit are itemized separately. After a walkthrough we send a fixed quote with every drop counted.
Cat6A supports 10 Gbps over the full 100 meters and the higher PoE loads of modern access points and cameras, so we recommend it for new construction. Cat6 remains cost-effective for shorter runs and simple office drops. Fiber is used for backbones between floors and buildings.
Yes. Most of our cabling work is on new construction and renovations, coordinated with GCs, architects and owner's reps from drawings through punch list. We attend coordination meetings and sequence rough-in and trim with the schedule.
Yes. Upgrades and retrofits are done after hours or in phases, with cutovers scheduled so staff arrive to working connections.
Every link is tested with a certified field tester to TIA standards, and you receive the report at handover. We install manufacturer-certified systems that qualify for extended warranties.
Yes. DIST designs and installs the switches, Wi-Fi, cameras, access control, conference rooms and audio the cabling serves, so one team owns the whole system.
Yes. We re-dress, re-label and re-terminate existing racks, replace failing patch cords and document every port, usually in a single after-hours visit.
Nationwide. We handle single sites and multi-site rollouts across the United States with our own field technicians.
Send us the drawings, the drop count and the timeline. A DIST engineer will walk the site, then come back with a cable schedule, a sequence and a fixed quote.